Resources · Guide · 4 min read

Maintenance requests: from report to done

Eight steps, from receiving the report to closing it with confirmation and evidence.

Receive the report with a photo, sort it by urgency, assign an owner, quote if needed, coordinate the visit, notify at each stage and close only with confirmation from the reporter.

A well-handled maintenance request is a short chain: someone reports, the problem is understood, someone is chosen to fix it, the work is done and it's confirmed to be resolved. Nearly every problem appears when a link is missing: the report arrives incomplete, nobody knows who's responsible or the work is done and nobody tells the tenant. This guide walks the chain from start to finish so each request reaches a clear close without chasing anyone.

1. Receive the report with what's needed

A good report answers three things: what's happening, where and how urgent it is. A photo and a sentence are usually enough: "the bathroom ceiling is leaking, apartment 304." Make it easy for the tenant to write in whatever way is natural, by message or photo, and confirm immediately that you received it. That confirmation lowers anxiety and stops them from reporting three times.

A single intake channel keeps reports from getting lost among calls, scattered messages and hallway comments.

2. Sort by urgency

Not everything is equal. Define three levels: urgent (a risk to people or damage that grows: a leak, an electrical fault, a broken entry gate), normal (affects use but can wait days) and schedulable (an improvement that can wait for the next visit). Each level carries a reasonable first-response time. The sorting decides whether a vendor is called today or booked for the week.

3. Assign an owner

Every request needs an owner: a named person or vendor. Without an owner, nobody moves it. Record who has it, since when and by when it's expected. If a quote is needed, that's the next step with its own date.

4. Quote and approve when it applies

If the job is larger, ask for quotes with a clear scope: what, where, materials and timing. Compare them by scope, timing and warranty, not just price. Define in writing up to what amount management decides and from which amount the board or owner is required. Safety emergencies follow a fast path with notice afterwards.

5. Coordinate the visit

Agree on a day and time with the tenant and the vendor, and confirm both the day before. A failed visit for lack of access or notice costs money and patience. If the work requires entering a unit, get clear authorization from whoever it applies to.

6. Keep the reporter informed

The tenant wants to know three things: that you received it, when someone will come and when it's resolved. A notice at each stage — received, assigned, scheduled, done — reduces follow-up calls and improves how the service is perceived, even when the fix takes time.

7. Close with confirmation and evidence

The job is finished when the reporter confirms it's right, not when the vendor leaves. Ask for photos of the result and check it matches the quote. Only then is it paid and the request closed. A close without confirmation is the cause of many repeat reports.

8. Learn from the data

With the request history you can answer: which buildings generate the most reports, which type of problem keeps recurring, how long does the first response take, which vendors deliver? A problem that recurs in the same place almost always calls for a root-cause fix, not another repair. This data is also the raw material for the monthly board report.

An example with times

Monday, 8:10: a tenant reports a leak with a photo; within minutes she gets confirmation and the case is sorted as urgent. 8:40: it's assigned to a plumber with notice to the tenant. 11:00: visit and temporary repair; the permanent job is scheduled with a quote. Tuesday: the quote is approved within the threshold. Thursday: work finished, photos of the result and the tenant's confirmation; it's closed. Every step was recorded with a date and a responsible person, which lets the board see the full history.

Frequent mistakes

  • Closing the request when the vendor leaves, without confirmation.
  • Not telling the tenant anything between the report and the fix.
  • Mixing emergencies with improvements in the same list.
  • Approving spending without a defined threshold.

How TriDot does it

In the property managers edition, the tenant reports to Dot on WhatsApp with a message or a photo; Dot records the request, sorts it and follows it up. Vendors have their own portal to see what's assigned and respond, quotes are requested and compared in one place and the tenant gets notices at each stage. Approving a quote or choosing a vendor is decided by a person: Dot does the repetitive work, you decide what matters.

Meet the property managers edition or book a 30-minute call and we'll go over how the flow would look with your buildings.

Frequently asked questions

Quick answers

How do I sort urgency?

Three levels: urgent, normal and schedulable, each with its first-response time.

Who approves a quote?

Set thresholds by amount: up to a point management decides; above it, the board or owner.

When is a request closed?

When the reporter confirms it's right and there's evidence of the result.